

Part of the group crossing the creek of Merlès by an appropriate footbridge where it borders between the municipalities of Gaià (Bages) and Puig-Reig (Berguedà), during the ICHN-Bages naturalist outing on 27.05.2023. Realize the high flow rate and the brown colour of the water; the creek has recovered after the rains of the 2nd half of May that hopefully end a very long episode of intense drought.
[photos Jordi Badia]
- Further information in Notícies de la ICHN nr.168.